Expert Guidance for New Extraction Facility Buildouts

C1D1 Facility Design Consulting

Call 24/7: (877) 489-3727

Building C1D1 Extraction Facilities Right the First Time

Designing a Class I Division 1 extraction facility requires specialized knowledge that most architects, contractors, and equipment vendors simply do not possess. Mistakes made during design and construction are extremely expensive to correct after the fact.

WERCS provides C1D1 facility design consulting to help extraction operators, architects, and contractors build compliant extraction facilities from the ground up. Our consulting services prevent costly errors including:

  • Incorrect hazardous area classification boundaries
  • Undersized ventilation systems that cannot achieve required air changes
  • Improperly located gas detection sensors
  • Non-explosion-proof equipment specified for C1D1 areas
  • Inadequate electrical infrastructure for hazardous location wiring

Getting C1D1 design right the first time saves hundreds of thousands of dollars compared to retrofitting non-compliant facilities.

Hazardous Area Classification Design

Proper hazardous area classification is the foundation of C1D1 facility design. Classification determines where explosion-proof equipment is required and affects virtually every aspect of facility construction.

Classification Factors

  • Extraction solvent type (butane, propane, ethanol) and flash point
  • Solvent quantities used and stored
  • Process equipment configuration and potential release points
  • Ventilation system design and air change rates
  • Building construction and vapor barriers

WERCS Classification Services

  • Review of proposed extraction equipment and processes
  • Area classification documentation per NEC Article 500
  • Classification boundary drawings for permit submission
  • Coordination with AHJ on classification interpretation
  • Classification review for equipment changes or additions

Area classification documents are required for building permits in most jurisdictions and are essential for fire marshal approval of extraction operations.

Ventilation System Design

Ventilation is critical for C1D1 extraction facilities. Properly designed ventilation can reduce area classification requirements, improve safety, and enable more efficient operations.

Design Requirements

  • Minimum 1 CFM per square foot of floor area per NFPA 30
  • Many AHJs require higher rates (1.5-2 CFM/sq ft) for extraction
  • Negative pressure maintenance relative to adjacent spaces
  • Proper exhaust discharge location and height
  • Makeup air tempering for climate control

WERCS Ventilation Consulting

  • Ventilation system sizing calculations
  • Air balance specifications for negative pressure
  • Equipment recommendations (fans, dampers, controls)
  • Exhaust discharge location review
  • Integration with gas detection and interlock systems

Undersized ventilation is the most common design error in extraction facility buildouts. Correcting ventilation after construction often requires significant structural modifications and equipment replacement.

Gas Detection System Design

Gas detection provides early warning of solvent releases and enables automatic safety responses. Proper sensor placement and system design is critical for effective detection.

Design Considerations

  • Sensor placement based on vapor density and airflow patterns
  • Butane and propane are heavier than air (sensors near floor level)
  • Number of sensors based on room size and obstructions
  • Response time requirements for safety interlocks
  • Redundancy requirements for critical applications

WERCS Gas Detection Consulting

  • Sensor quantity and placement recommendations
  • Equipment specification (sensor type, transmitter model)
  • Alarm setpoint recommendations (10%/25% LEL typical)
  • Interlock logic design for ventilation and shutdown
  • Integration with building automation and monitoring systems

Improper sensor placement is a common audit finding. Sensors placed in wrong locations or quantities may not detect releases quickly enough to prevent dangerous accumulations.

Electrical System Design Support

Electrical systems in C1D1 areas require specific wiring methods, equipment ratings, and installation practices per NEC Articles 500-503.

C1D1 Electrical Requirements

  • Rigid metal conduit or equivalent wiring methods
  • Sealing fittings at specified locations
  • Explosion-proof equipment rated Class I, Division 1, Group D
  • Proper temperature class (T-code) for solvent flash point
  • Intrinsically safe circuits for instrumentation

WERCS Electrical Consulting

  • Electrical equipment specifications for C1D1 areas
  • Review of electrical drawings for code compliance
  • Conduit seal location requirements
  • Intrinsically safe system design support
  • Coordination with electrical engineers and contractors

Many electrical contractors are unfamiliar with C1D1 requirements. WERCS consulting helps prevent installation errors that are expensive to correct after construction.

Permitting and AHJ Coordination

extraction extraction facilities require approvals from multiple authorities having jurisdiction (AHJs) including fire marshals, building departments, and state extraction regulators.

Common Permit Requirements

  • Hazardous area classification documentation
  • Ventilation system design drawings and calculations
  • Gas detection system specifications and layout
  • Electrical permit for hazardous location wiring
  • State extraction license application documentation

WERCS Permitting Support

  • Preparation of permit application documents
  • Technical responses to plan review comments
  • Pre-application meetings with fire marshals
  • Inspection support and deficiency resolution
  • Final approval documentation

WERCS has successfully supported permit approvals for extraction facilities in Colorado, Washington, Oregon, California, Michigan, Nevada, and other legal extraction states. Our experience with specific AHJ requirements accelerates the permitting process.

What the Visit Covers

  • Avoid costly design errors that require expensive post-construction corrections
  • Ensure proper area classification documentation for permit approval
  • Design ventilation systems that meet or exceed code requirements
  • Specify gas detection systems with proper sensor placement and coverage
  • Accelerate permitting with properly prepared documentation
  • Reduce construction delays with code-compliant designs from the start

Frequently Asked Questions

Ideally, engage C1D1 consulting during the earliest design phases, before architectural drawings are finalized. Early engagement allows proper integration of hazardous location requirements into the overall facility design. Consulting after construction begins often reveals issues that are expensive to correct.
WERCS provides technical specifications, equipment recommendations, and design review services. For stamped engineering drawings, we coordinate with licensed professional engineers who specialize in hazardous location design. We can recommend engineers familiar with extraction extraction facilities in your jurisdiction.
Yes, WERCS provides remediation consulting for existing facilities with compliance deficiencies. We assess current conditions, develop remediation plans, and support implementation of corrections. Remediation is typically more expensive than proper initial design, but we minimize costs through practical engineering solutions.
WERCS provides C1D1 consulting services nationwide. We have specific experience with AHJ requirements in Colorado, Washington, Oregon, California, Michigan, Nevada, Arizona, Oklahoma, and other legal extraction states. Code requirements vary by jurisdiction, and we ensure designs meet local requirements.
Consulting fees are typically structured as fixed-fee engagements based on project scope, or hourly rates for ongoing support. We provide detailed proposals outlining scope, deliverables, and fees before engagement. Consulting investment is typically recovered many times over through avoided construction errors and accelerated permitting.

Have a question not answered here?

Call us at (877) 489-3727